Child pages
  • Adjusting Work Time

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

To adjust the work start time:

  1. As the Time Tracker is running click the Work started/Time spent label on the Time Tracker.
  2. The start time adjustment control is shown.

    Image Added

  3. By default the slider is located at the position representing the tracking start time.
  4. You can adjust the start time, dragging the slider to the left. You can only work on one bug at a time so no records can overlap. So as you move the start time necessary adjustment are made to other records marked on the time line. Depending on the slider new position records can be adjusted, removed, or merged (if the slider is positioned on the work period of the same bug).
  5. Click Set to save the changes.
Tip

Once the work is stopped and the record is saved to the timesheet, it can be edited in the Edit and Publish Time window. See the Timesheets Publishing section for the details.