The following are detailed instructions for visualizing SAFe in Structure.
To do this, you will need:
Ready-to-use demo space: Live Demo
We assume that your JIRA is prepared for scaling. The most common configuration is to create separate projects for each level:
Features are named "Epics" in JIRA, so you can rename them in Administration. Projects for each Team (Scrum or kanban, Scrum is preferable) and Issue types (User Story, Bug, Improvement, Enabler) can be left as is. |