29th of May, 2019
|
Download App
Structure.Gantt on Atlassian Marketplace
Structure.Gantt will become a paid app beginning with release 2.0. |
Patch releaseThis is a patch release based on version 1.4.0. We have addressed the following issues:
Installation and UpgradeStructure.Gantt 1.4.1 requires Structure 5.3 or above. If you already have production data from a previous version of Structure.Gantt, please consider backing up your data before upgrading. Enterprise deployment notesWith Structure.Gantt 1.4.1 we're introducing a new feature that should prevent excessive resource usage for huge Gantt charts or charts that are unable to complete the schedule calculation in a reasonable time. By default, schedule calculation will be paused for a structure if it exceeds 5 minutes. Normally scheduling should not exceed 5 minutes for very large structures (scheduling of structures with 100k issues takes around 2.5 minutes to calculate), but since we are unable to check all possible configurations we've made this timeout configurable. Please, refer to Structure.Gantt Troubleshooting for details on how to adjust it. To ensure this timeout does not affect your charts, it is recommended to perform the following operations at the staging environment before updating production servers:
In the event that you receive a "Scheduling has been paused" message, the corresponding timeout may need to be increased. |